2023 Skoda Fabia 1.0 TSI Colour Edition 5dr

£14,350
Or £ Per Month

Key Features

Reg Year 2023 (73)
Registration RX73EVM
Transmission Manual
Mileage 12,393 miles
Fuel Type Petrol
Body type Hatchback
Seats
5
Copied!

call now Call on 01225 485400

Platinum Skoda Bath, Lower Bristol Road, Bath
BA2 3DN

  • Exterior Features
  • Special solid paint
  • Driver Convenience
  • Rear parking sensors
  • Miscellaneous
  • Amundsen navigation system with traffic sign recognition
  • voice control
  • care connect and infotainment online
  • Interior Features
  • Manual air conditioning
  • 2 spoke leather multifunction steering wheel
  • Packs
  • Colour concept black styling - Fabia Hatchback
  • Exterior Features
  • Electrically adjustable front windows with function auto up/down
  • Front window wiper intermittent control
  • Mechanical adjustable rear windows
  • Privacy glass
  • Rain sensor
  • Rear window wiper with washing nozzles
  • Body coloured bumpers
  • Ice scraper in fuel cap
  • Rear side wing doors
  • Roof mounted spoiler
  • SKODA tailgate lettering in chrome
  • Basic LED Headlights
  • Front fog lights
  • Headlight range control - Automatic
  • LED daytime running lights with coming and leaving home feature
  • Rear LED fog light
  • Third brake light
  • Safety
  • Dimming rear view mirror with black frame
  • Door mirror integrated indicators
  • Electrically adjustable and heated door mirrors
  • 3-point height adjustable front seats belts with pretensioner and force limiter
  • Automatic warning lights in case of crash
  • Driver and passengers airbag with switch off function
  • e-Call+
  • Three rear 3-points safety seat belts with pretensioner and force limiter including stop function for outer rear seat belts
  • Tyre pressure monitoring system
  • Audio / Communications
  • Bluetooth connection
  • 2x USB-C in the front (for data transmission and charging)
  • 6 Speakers (4 in front and 2 in rear)
  • Auxiliary socket for external MP3 player
  • Bolero radio with 8 inch colour display
  • DAB digital radio reception
  • Amundsen navigation system
  • Driver Convenience
  • Driver alert system - DAS
  • Electromechanical power steering
  • Lane assist including road edge detection
  • Miscellaneous
  • Exterior temperature gauge
  • Service interval indicator
  • Virtual cockpit with 10.25 inch colour display
  • Trim
  • Anodized cross line upper decorative trim
  • Colour Edition air vents
  • Grain satin black central console cover
  • Grain satin black lower decorative trim
  • Satin black door and side trim panel in front
  • 3 rear headrests
  • Backrest split and folding
  • Height adjustable drivers seat
  • Height adjustable front headrests
  • ISOFIX and TopTether anchorage points to the outer rear seats
  • ISOFIX and TopTether on the front passenger seat
  • Rear seat bench unsplit
  • Interior Features
  • Pollen filter
  • Central console with fixed cup holder and storage box
  • Chrome handbrake release button
  • Fabric upholstery
  • Gearshift knob/handle in leather
  • Grain satin black interior door handles
  • Hand brake lever handle in leather
  • Height adjustable steering wheel
  • Storm grey headlining
  • Ticket holder
  • Umbrella in drivers door
  • 2 reading lights in front and 2 reading lights in rear
  • Luggage compartment lighting
  • Sun visors with mirror and airbag label on passenger side
  • Security
  • Anti-theft alarm system including immobiliser
  • interior monitoring
  • backup horn
  • and towing protection
  • Central locking with radio remote control
  • interior controls
  • SAFE function and 2 foldable keys
  • KESSY - Keyless engine start/stop
  • Wheels
  • Anti-theft wheel bolts protection
0-60 time 10.7
BHP 94
Torque 129
Max Speed (mph) 118
Aspiration ~
Drive Axle ~
Engine Size 999
MPG (urban) ~
MPG (extra urban) ~
Height (mm) 1,459
Length (mm) 4,108
Width (mm) 1,954
Kerb Weight 1,090
Gross Weight 1,610
Market Segment Supermini Hatch 5Dr
Bore 75
Stroke 76
Cylinders 3
Fuel Delivery ~
Drive Type ~
Engine Location ~
Forward Gears ~
Seats 5
Valves Per Cylinder 12
Tax Band ~

Want us to call you back?

Enter your details & we'll get back to you within 1 working day

Contact Us

Platinum Motor Group, Unit 12 Meridian Motor Park, North Bradley, Trowbridge, Wiltshire, BA14 0BJ

Platinum Motor Group is a trading name of Renrod Limited. Registered Office, Platinum Motor Group, Unit 12 Meridian Business Park, North Bradley, Trowbridge. BA14 0BJ. Registered in England No. 1210595. VAT Registration No. 821 9379 14. Renrod Ltd t/a Platinum Motor Group is authorised and regulated by the Financial Conduct Authority. FRN: 689306. We are a Credit Broker not a Lender and can introduce you to a limited number of lenders. An introduction to a lender does not amount to independent financial advice. Our approach is to introduce you first to the relevant manufacturer supporting finance company. If they are unable to make you a finance offer, we will inform you and request your permission to submit a proposal to another of our lenders. Please ask for a list of our funding partners. Lenders pay a fixed commission to us for introducing you to them, calculated by reference to the vehicle model or amount you borrow. Different lenders pay different commissions for such introductions and our manufacturer supporting finance companies also provide funding for our vehicle stock and financial support for our training and marketing. However, any such amounts they and other lenders pay us will not affect the amounts you pay under your finance agreement, all of which are set by the lender concerned. Renrod Ltd t/a Platinum Motor Group is an Appointed Representative of AutoProtect (MBI) Limited for General Insurance distribution purposes which is authorised and regulated by the Financial Conduct Authority for Insurance Distribution (Firm Reference Number 312143). You can check this on the FCA Register by visiting the www.fca.org.uk

SKODA FABIA

Simply enter your email address and/or mobile number below and we will send the details of this vehicle directly to you.

If you would like to be contacted in the future about this or similar vehicles then please provide your consent to the following contact methods.

Visit the CogCast website